Jobsite lessons
Southern Utah

You run the build.
I walk it through with you.

Jobsite lessons from a working framer. What to check in your plans, bids, schedule, and framing at each phase, before it gets covered up. For owner-builders in Washington County and across southern Utah.

Who it's for

For homeowners building their own homes.

You're the builder. You pull the permit, hire the subs, and make the calls. These lessons are about making them with your eyes open.

Owner-builders

You hold the permit and run the job. You want to know what someone who frames houses for a living looks at before it gets covered up.

First-time builders

You've never done this before. You need the build order, the inspections, and what to watch for, laid out in plain English.

People managing their own subs

You're collecting bids and scheduling trades. Checking scope, pricing, and sequencing carefully can save real money.

Out-of-area owners

You're building in southern Utah but don't live here yet. Learn what's different here: soils, heat, monsoon drainage, and local inspections.

How it works

Read the checks. Walk the job. Ask early.

You stay the builder of record. Use the phase lists on this site as a way to look carefully at your own work, with your plans in hand.

  1. Read the checks for the phase you're in

    Six phases, from lot and plans through a last look before close. Start with the one in front of you.

  2. Walk the job yourself

    Take your plans on site. Look at the work before it gets covered, and write down what doesn't line up.

  3. Ask before it's covered

    Take questions to your inspector, your engineer, and your trades. They have the last word, not a website.

Watch for

Three places owner-builders lose money.

  1. On paper

    Plans where the headers, beams, and plate heights don't agree with each other or with the trusses. Cheapest place to catch it.

  2. In the bids

    Missing scope, loose allowances, and numbers that don't match the plans. Compare bids line by line before you sign.

  3. On site

    Trades out of order and work covered before it's checked. Walk the job at layout, before cover, and before drywall.

The six phases

What a framer checks at each phase.

These are the looks that matter most on a southern Utah house. Use them with your own plans, your engineer, and your inspector. They are general education, not a walk of your job and not a substitute for the city.

Phase 1

Lot & plans

  • Before you buy, or before you finalize plans
  • Whether headers, beams, plate heights, and truss bearing agree with each other
  • Drainage and soils questions that belong on paper first

Phase 2

Pre-pour / foundation

  • Forms, steel, anchors, and plumbing stub-ups
  • Walk it before the truck comes — it's hard to change after

Phase 3

Framing

  • Walls, headers, hold-downs, and sheathing
  • Bearing and plate heights that match the drawings
  • Check it before the framing inspection, and before anything is covered

Phase 4

Pre-drywall / rough-ins

  • Walls still open: blocking, penetrations, and fire blocking
  • Last look before the drywall goes up

Phase 5

Grade & drainage

  • Where water goes in a southern Utah monsoon
  • Walk the pad and the slope before landscaping locks it in

Phase 6

Pre-close / final

  • A room-by-room list of what's still open
  • Look carefully before the last payments. You stay the builder of record.
You stay the builder of record. You hold the permit and hire and pay your own trades.
Your plans and your inspector win. Nothing here replaces the city, your engineer, or DOPL.
Paid consulting isn't offered yet. This site is general education until my Utah contractor license is issued.

Resources

Follow along. More is on the way.

The best place to catch new jobsite lessons is Instagram. City guides for Washington County towns, and a free pre-drywall checklist, are in the works.

Instagram

Follow @redrockbuildcoach

Jobsite lessons, in the order a house goes up, from a working framer in the St. George area.

instagram.com/redrockbuildcoach

City guides

Washington County towns

Plain-English notes on permits and owner-builder rules, city by city, with sources. Confirm every fact with the city and with DOPL.

Coming soon

Checklist

Pre-drywall walkthrough

A free checklist for the last look while the walls are still open. It isn't posted yet.

Coming soon

Scope

What I am, and what I'm not.

I am

  • A working framer in southern Utah
  • Someone who writes down what I look for, in plain language
  • A teacher, through the lessons I share here

I'm not

  • Your general contractor
  • Your engineer
  • Your inspector, or a home inspector
  • A sub doing the work
  • Your lender's or city's sign-off

Why a framer

The framing is the skeleton of the house.

Everything else hangs on it: the roof, the windows, the drywall, the cabinets. When something is off in the plans or the bids, it usually shows up in the framing first, and it's a lot cheaper to fix on paper than after the walls are up.

  • Plan problems. Headers, beams, bearing points, shear walls, and plate heights that don't line up with each other or with the trusses.
  • Bid problems. Missing scope, loose allowances, and numbers that don't match the plans.
  • Sequencing problems. Trades showing up in the wrong order and work getting covered before it's checked.

I frame houses for a living in southern Utah. Here's what I look for, in plain language.

Illustration of a framed wall with a header over a window opening, studs, and top plates Header sized right?
Headers, bearing, and plate heights: the details a framer checks first.

Recent builds

From the job site.

Jobsite photos (shared with permission) are coming soon.

Jobsite photos, shared with permission, will go here.

FAQ

Straight answers.

What is an owner-builder?

An owner-builder is a property owner who acts as their own builder: you pull the building permit, hire and pay the subcontractors, and are responsible for the job. In Utah, the owner-builder exemption generally limits you to one residence per year and three in five years, for your own non-commercial use. Rules vary, so confirm with your local building department.

Do you act as my contractor?

No. You remain the builder of record. You hold the permit and hire, direct, and pay your subs and suppliers directly. Red Rock Build Coach is education, not construction. It doesn't perform or supervise construction or handle project funds.

Do you offer paid consulting?

Not yet. My Utah contractor license application is in progress, and paid services won't be offered or priced on this site until it's issued. For now, everything here is free, general education.

Do you build homes?

Not through Red Rock Build Coach. Red Rock is the education and consulting side. Hands-on construction is planned through MCQ Design+Build, once the Utah contractor license is issued. That company isn't taking construction projects yet.

Is this advice for my project?

No. It's general information. Your plans, your engineer, your city's adopted code, and your building inspector have the final word. Check any contractor's license with Utah DOPL.

Are you an architect or engineer?

No. I'm a framer. I look at plans from the build side and flag things that may need attention, but I don't design, stamp, or certify plans or structural work. Nothing here replaces your building department's inspections or an engineer's review.

When should I start checking?

The earlier the better. The cheapest time to fix a problem is on paper, before you sign bids or order materials. A careful walk of your own job before framing gets covered, or before drywall, can still catch issues while they're easy to fix.

Contact

Ask a question.

General questions, corrections, or topic ideas for future lessons. I can't give advice on individual projects through this site yet.

Required. By sending, you agree to our Terms and Privacy Policy. Sending a message doesn't create a consulting relationship, and no paid services are offered at this time.