Owner-builders
You hold the permit and run the job. You want to know what someone who frames houses for a living looks at before it gets covered up.
Jobsite lessons
Southern Utah
Jobsite lessons from a working framer. What to check in your plans, bids, schedule, and framing at each phase, before it gets covered up. For owner-builders in Washington County and across southern Utah.
Who it's for
You're the builder. You pull the permit, hire the subs, and make the calls. These lessons are about making them with your eyes open.
You hold the permit and run the job. You want to know what someone who frames houses for a living looks at before it gets covered up.
You've never done this before. You need the build order, the inspections, and what to watch for, laid out in plain English.
You're collecting bids and scheduling trades. Checking scope, pricing, and sequencing carefully can save real money.
You're building in southern Utah but don't live here yet. Learn what's different here: soils, heat, monsoon drainage, and local inspections.
How it works
You stay the builder of record. Use the phase lists on this site as a way to look carefully at your own work, with your plans in hand.
Six phases, from lot and plans through a last look before close. Start with the one in front of you.
Take your plans on site. Look at the work before it gets covered, and write down what doesn't line up.
Take questions to your inspector, your engineer, and your trades. They have the last word, not a website.
Watch for
Plans where the headers, beams, and plate heights don't agree with each other or with the trusses. Cheapest place to catch it.
Missing scope, loose allowances, and numbers that don't match the plans. Compare bids line by line before you sign.
Trades out of order and work covered before it's checked. Walk the job at layout, before cover, and before drywall.
The six phases
These are the looks that matter most on a southern Utah house. Use them with your own plans, your engineer, and your inspector. They are general education, not a walk of your job and not a substitute for the city.
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
Resources
The best place to catch new jobsite lessons is Instagram. City guides for Washington County towns, and a free pre-drywall checklist, are in the works.
Jobsite lessons, in the order a house goes up, from a working framer in the St. George area.
City guides
Plain-English notes on permits and owner-builder rules, city by city, with sources. Confirm every fact with the city and with DOPL.
Coming soon
Checklist
A free checklist for the last look while the walls are still open. It isn't posted yet.
Coming soon
Scope
Why a framer
Everything else hangs on it: the roof, the windows, the drywall, the cabinets. When something is off in the plans or the bids, it usually shows up in the framing first, and it's a lot cheaper to fix on paper than after the walls are up.
I frame houses for a living in southern Utah. Here's what I look for, in plain language.
Recent builds
Jobsite photos (shared with permission) are coming soon.
Jobsite photos, shared with permission, will go here.
FAQ
An owner-builder is a property owner who acts as their own builder: you pull the building permit, hire and pay the subcontractors, and are responsible for the job. In Utah, the owner-builder exemption generally limits you to one residence per year and three in five years, for your own non-commercial use. Rules vary, so confirm with your local building department.
No. You remain the builder of record. You hold the permit and hire, direct, and pay your subs and suppliers directly. Red Rock Build Coach is education, not construction. It doesn't perform or supervise construction or handle project funds.
Not yet. My Utah contractor license application is in progress, and paid services won't be offered or priced on this site until it's issued. For now, everything here is free, general education.
Not through Red Rock Build Coach. Red Rock is the education and consulting side. Hands-on construction is planned through MCQ Design+Build, once the Utah contractor license is issued. That company isn't taking construction projects yet.
No. It's general information. Your plans, your engineer, your city's adopted code, and your building inspector have the final word. Check any contractor's license with Utah DOPL.
No. I'm a framer. I look at plans from the build side and flag things that may need attention, but I don't design, stamp, or certify plans or structural work. Nothing here replaces your building department's inspections or an engineer's review.
The earlier the better. The cheapest time to fix a problem is on paper, before you sign bids or order materials. A careful walk of your own job before framing gets covered, or before drywall, can still catch issues while they're easy to fix.
Contact
General questions, corrections, or topic ideas for future lessons. I can't give advice on individual projects through this site yet.